Back to Album

Next photo

Previous photo

190118

The Project Manager at work

With the chassis on a rotisserie it made it a lot easier to get to all the tubes, welds and tight spaces.  Sanding the chassis ready for paint took several days and was a very tedious task.  However, the better the preparation the better the paint job.

[Locost  Home] [Locost Finished] [Background] [Donor Car] [Specifications] [Chassis build] [Photo album] [Donor car] [MX5 parts] [Assembling] [Chassis build] [Front end] [Rear end] [Engine] [Electrics] [Bits & pieces] [Bodywork] [Body finishing] [Interior] [Rotisserie] [Bright 2006] [Clubman cars] [Locost links] [Meet the owner]